Installation Considerations & Guidance

Monitor systems are suitable for DIY installation, however there are a number of considerations such as an individuals technical ability and the type of installation required, someone with a good electrical/electronics trade knowledge will be comfMonitor Rugged Control Box Installationortable with the installation.

Cable runs, completed such that they are left hidden and without damaging the fabric of the boat, will probably present the biggest challenge and as is the case in any installation of a similar nature, take the majority of the time.

Some ancillaries such as the Shore Power Sensor (as it involves 240v electrical work) must be installed by suitably qualified engineer, Professional Marine Installers are familiar with these challenges so are well equipped to carry out any Monitor Installation.

 Monitor GSM Module

Step by step guidance in designing the system layout is detailed in System Layout  

We use cookies to improve our website and your experience when using it. Cookies used for the essential operation of the site have already been set. To find out more about the cookies we use and how to delete them, see our Privacy Policy.

I accept cookies from this site

EU Cookie Directive Plugin Information